{"id":3911,"date":"2015-01-19T14:22:28","date_gmt":"2015-01-19T13:22:28","guid":{"rendered":"https:\/\/bseymond.nl\/?page_id=3911"},"modified":"2021-02-26T10:35:34","modified_gmt":"2021-02-26T09:35:34","slug":"rail-platforms-construction-viaduct","status":"publish","type":"page","link":"https:\/\/bseymond.nl\/en\/rail-platforms-construction-viaduct","title":{"rendered":"Rail platforms for construction viaduct"},"content":{"rendered":"<p><strong>At the end of 2014\u00a0BSE Ymond rented out all 3\u00a0Rail platforms to a contractor for activities on a road overpass on the A20 near Rotterdam during a weekend.\u00a0All activities had to be performed in a very small time frame as the rail section Gouda-Rotterdam is one of the busiest sections of railway in the Netherlands.\u00a0Amongst others, the BSE rail platforms contributed to a successful finish of the project well before the established deadline on Sunday morning.<\/strong><\/p>\n<p>The activities included the application of steel locking plates along with an epoxy resin in the ceiling of the overpass over the\u00a0double-tracks.\u00a0The activities were needed to prevent the concrete plates from being pulled together under influence of wind load on the noise barriers at the side of the highway.\u00a0This can cause the wind barriers from coming loose over a longer period of time. All activities had to be carried out in a very\u00a0short decommissioning slot of only 35 hours on the busy track section.\u00a0\u00a0This required the activities to be performed very fast and efficient.<\/p>\n<p>The BSE Rail platforms with their very large platforms (total of 70m^2 each) and large loading capacity played a key role in this process. Our machines enabled three crews of 8 persons each along with their gear (genset, epoxy mixing equipment, rotary hamers, epoxy resin and other equipment) to carry out their tasks above\u00a0the tracks at three locations at the same time. Would these activities have been carried out with smaller\u00a0telescopic boom lifts, then it was questionable whether or not they had met the deadline. Amongst others,\u00a0the BSE Rail platforms enabled the contractor\u00a0to meet the deadline\u00a0with plenty of time to spare!<\/p>\n<p>Both the principal, contractor and railway operator were all very happy with the end result. The activities were carried out well and within the allowed time frame. All too often rail projects during weekends take longer than expected, thus resulting in very high fines for the contractors involved. Renting the BSE\u00a0Rail platforms may prevent that from happening ever again!<\/p>\n<p><img decoding=\"async\" class=\"alignleft size-portfolio wp-image-3907\" src=\"https:\/\/bseymond.nl\/wp-content\/uploads\/2015\/01\/20141022_145706-495x400-5737979.jpg\" alt=\"20141022_145706-495x400-5737979\" width=\"495\" height=\"400\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" class=\"alignleft size-portfolio wp-image-3906\" src=\"https:\/\/bseymond.nl\/wp-content\/uploads\/2015\/01\/20141025_054450-495x400-6021995.jpg\" alt=\"20141025_054450-495x400-6021995\" width=\"495\" height=\"400\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" class=\"alignleft size-portfolio wp-image-3905\" src=\"https:\/\/bseymond.nl\/wp-content\/uploads\/2015\/01\/20141025_110322-495x400-1102756.jpg\" alt=\"20141025_110322-495x400-1102756\" width=\"495\" height=\"400\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>At the end of 2014\u00a0BSE Ymond rented out all 3\u00a0Rail platforms to a contractor for activities on a road overpass on the A20 near Rotterdam during a weekend.\u00a0All activities had to be performed in a very small time frame as the rail section Gouda-Rotterdam is one of the busiest sections of railway in the Netherlands.\u00a0Amongst [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"class_list":["post-3911","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rail platforms for construction viaduct - BSE Ymond BV<\/title>\n<meta name=\"description\" content=\"Three BSE Rail platforms have been used in construction work to a viaduct, applying plates and epoxy resin.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bseymond.nl\/en\/rail-platforms-construction-viaduct\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rail platforms for construction viaduct - BSE Ymond BV\" \/>\n<meta property=\"og:description\" content=\"Three BSE Rail platforms have been used in construction work to a viaduct, applying plates and epoxy resin.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bseymond.nl\/en\/rail-platforms-construction-viaduct\" \/>\n<meta property=\"og:site_name\" content=\"BSE Ymond BV\" \/>\n<meta property=\"article:modified_time\" content=\"2021-02-26T09:35:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bseymond.nl\/wp-content\/uploads\/2015\/01\/20141022_145706-495x400-5737979.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/bseymond.nl\\\/en\\\/rail-platforms-construction-viaduct\",\"url\":\"https:\\\/\\\/bseymond.nl\\\/en\\\/rail-platforms-construction-viaduct\",\"name\":\"Rail platforms for construction viaduct - BSE Ymond BV\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bseymond.nl\\\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/bseymond.nl\\\/en\\\/rail-platforms-construction-viaduct#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/bseymond.nl\\\/en\\\/rail-platforms-construction-viaduct#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/bseymond.nl\\\/wp-content\\\/uploads\\\/2015\\\/01\\\/20141022_145706-495x400-5737979.jpg\",\"datePublished\":\"2015-01-19T13:22:28+00:00\",\"dateModified\":\"2021-02-26T09:35:34+00:00\",\"description\":\"Three BSE Rail platforms have been used in construction work to a viaduct, applying plates and epoxy resin.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/bseymond.nl\\\/en\\\/rail-platforms-construction-viaduct#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/bseymond.nl\\\/en\\\/rail-platforms-construction-viaduct\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bseymond.nl\\\/en\\\/rail-platforms-construction-viaduct#primaryimage\",\"url\":\"https:\\\/\\\/bseymond.nl\\\/wp-content\\\/uploads\\\/2015\\\/01\\\/20141022_145706-495x400-5737979.jpg\",\"contentUrl\":\"https:\\\/\\\/bseymond.nl\\\/wp-content\\\/uploads\\\/2015\\\/01\\\/20141022_145706-495x400-5737979.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/bseymond.nl\\\/en\\\/rail-platforms-construction-viaduct#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/bseymond.nl\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Rail platforms for construction viaduct\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/bseymond.nl\\\/en#website\",\"url\":\"https:\\\/\\\/bseymond.nl\\\/en\",\"name\":\"BSE Ymond BV\",\"description\":\"Hoogwerkers, rail-weg voertuigen, machinebouw, mechanisatie\",\"publisher\":{\"@id\":\"https:\\\/\\\/bseymond.nl\\\/en#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/bseymond.nl\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/bseymond.nl\\\/en#organization\",\"name\":\"BSE Ymond BV\",\"url\":\"https:\\\/\\\/bseymond.nl\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bseymond.nl\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/bseymond.nl\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/cropped-bse_icon.png\",\"contentUrl\":\"https:\\\/\\\/bseymond.nl\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/cropped-bse_icon.png\",\"width\":512,\"height\":512,\"caption\":\"BSE Ymond BV\"},\"image\":{\"@id\":\"https:\\\/\\\/bseymond.nl\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/bse-ymond\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rail platforms for construction viaduct - BSE Ymond BV","description":"Three BSE Rail platforms have been used in construction work to a viaduct, applying plates and epoxy resin.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bseymond.nl\/en\/rail-platforms-construction-viaduct","og_locale":"en_US","og_type":"article","og_title":"Rail platforms for construction viaduct - BSE Ymond BV","og_description":"Three BSE Rail platforms have been used in construction work to a viaduct, applying plates and epoxy resin.","og_url":"https:\/\/bseymond.nl\/en\/rail-platforms-construction-viaduct","og_site_name":"BSE Ymond BV","article_modified_time":"2021-02-26T09:35:34+00:00","og_image":[{"url":"https:\/\/bseymond.nl\/wp-content\/uploads\/2015\/01\/20141022_145706-495x400-5737979.jpg","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/bseymond.nl\/en\/rail-platforms-construction-viaduct","url":"https:\/\/bseymond.nl\/en\/rail-platforms-construction-viaduct","name":"Rail platforms for construction viaduct - BSE Ymond BV","isPartOf":{"@id":"https:\/\/bseymond.nl\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/bseymond.nl\/en\/rail-platforms-construction-viaduct#primaryimage"},"image":{"@id":"https:\/\/bseymond.nl\/en\/rail-platforms-construction-viaduct#primaryimage"},"thumbnailUrl":"https:\/\/bseymond.nl\/wp-content\/uploads\/2015\/01\/20141022_145706-495x400-5737979.jpg","datePublished":"2015-01-19T13:22:28+00:00","dateModified":"2021-02-26T09:35:34+00:00","description":"Three BSE Rail platforms have been used in construction work to a viaduct, applying plates and epoxy resin.","breadcrumb":{"@id":"https:\/\/bseymond.nl\/en\/rail-platforms-construction-viaduct#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bseymond.nl\/en\/rail-platforms-construction-viaduct"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bseymond.nl\/en\/rail-platforms-construction-viaduct#primaryimage","url":"https:\/\/bseymond.nl\/wp-content\/uploads\/2015\/01\/20141022_145706-495x400-5737979.jpg","contentUrl":"https:\/\/bseymond.nl\/wp-content\/uploads\/2015\/01\/20141022_145706-495x400-5737979.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/bseymond.nl\/en\/rail-platforms-construction-viaduct#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bseymond.nl\/en"},{"@type":"ListItem","position":2,"name":"Rail platforms for construction viaduct"}]},{"@type":"WebSite","@id":"https:\/\/bseymond.nl\/en#website","url":"https:\/\/bseymond.nl\/en","name":"BSE Ymond BV","description":"Hoogwerkers, rail-weg voertuigen, machinebouw, mechanisatie","publisher":{"@id":"https:\/\/bseymond.nl\/en#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bseymond.nl\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/bseymond.nl\/en#organization","name":"BSE Ymond BV","url":"https:\/\/bseymond.nl\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bseymond.nl\/en#\/schema\/logo\/image\/","url":"https:\/\/bseymond.nl\/wp-content\/uploads\/2020\/12\/cropped-bse_icon.png","contentUrl":"https:\/\/bseymond.nl\/wp-content\/uploads\/2020\/12\/cropped-bse_icon.png","width":512,"height":512,"caption":"BSE Ymond BV"},"image":{"@id":"https:\/\/bseymond.nl\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/bse-ymond\/"]}]}},"_links":{"self":[{"href":"https:\/\/bseymond.nl\/en\/wp-json\/wp\/v2\/pages\/3911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bseymond.nl\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/bseymond.nl\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/bseymond.nl\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bseymond.nl\/en\/wp-json\/wp\/v2\/comments?post=3911"}],"version-history":[{"count":3,"href":"https:\/\/bseymond.nl\/en\/wp-json\/wp\/v2\/pages\/3911\/revisions"}],"predecessor-version":[{"id":5169,"href":"https:\/\/bseymond.nl\/en\/wp-json\/wp\/v2\/pages\/3911\/revisions\/5169"}],"wp:attachment":[{"href":"https:\/\/bseymond.nl\/en\/wp-json\/wp\/v2\/media?parent=3911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}